GO Fill|CLASSIFICATION-HAZ

HAZARDOUS AREA CLASSIFICATION CLASSIFICATION-HAZ

Sale price$9,000.00

Tax excluded. Shipping calculated at checkout

All prices are in AUD and exclude GST.
GST (10%) is calculated at checkout. Tax invoices provided with all orders.

In stock

Contact for live availability

Our inventory signal hasn't refreshed today. We update twice daily but the latest reading is stale.

Email sales@goind.com.au or call 07 3204 2240 for live availability.

Fast Shipping

Ships from Brisbane warehouse. Standard delivery 2-5 business days Australia-wide.

Free Shipping $500+
12 Month Warranty
AU Stock
About the HAZARDOUS AREA CLASSIFICATION CLASSIFICATION-HAZ

AUTHORITY-READY HAZ AREA DOCS WITHOUT THE COMPLIANCE GUESSWORK

Certified Hazardous Area Classification and drawing package for fuel storage and dispensing sites, prepared to AS/NZS 60079.10.1/2 and AS/NZS 3000 compliance.

Engineer Certification signed off by qualified personnel
Site specific classification - tailored to your fuel type, storage volume, and layout
Compliance AS/NZS 60079.10.1/2 and Electrical Safety Regulations Act 2013
Drawing Package zone boundaries, equipment ratings, installation notes
Authority Submission documentation suitable for lodgement with electrical safety authorities
View all
Overview

What you get

Site-specific Hazardous Area Classification to AS/NZS 60079.10.1/2, zone drawings with equipment ratings, installation schedules, and engineer certification. One package covers what the electrical inspector needs to see and what your contractor needs to install correctly. Diesel, petrol, LPG - common fuel types covered.

Key benefit

Why it matters

AS/NZS 3000 Section 7.7 makes classification mandatory for fuel installations. Without it, the electrical work cannot be signed off, the site cannot go live, and insurance may refuse cover. This is not optional paperwork - it is the legal gate between installation and operation. Qualified engineers prepare the package so it passes authority scrutiny first time.

Features & Benefits

Key Features

  • AS/NZS 60079.10.1/2 compliant classification
  • Site-specific zone drawings and schedules
  • AS/NZS 3000 Section 7.7 requirement coverage
  • Electrical Safety Regulations Act 2013 compliant
  • Engineer-certified documentation package
  • Suitable for authority lodgement

Benefits

  • Legal compliance for fuel installation sign-off
  • Avoids electrical inspector rejections and rework
  • Clear zone maps guide contractor installation
  • Protects insurability of the fuel system
  • One package covers classification and drawings
Compliance
Engineer Certification signed off by qualified personnel
Engineer Certification
signed off by qualified personnel
General
Site specific classification - tailored to your fuel type, storage volume, and layout
Compliance AS/NZS 60079.10.1/2 and Electrical Safety Regulations Act 2013
Drawing Package zone boundaries, equipment ratings, installation notes
Authority Submission documentation suitable for lodgement with electrical safety authorities
Diesel, Petrol, LPG classification for common fuel types
Site
specific classification - tailored to your fuel type, storage volume, and layout
Compliance
AS/NZS 60079.10.1/2 and Electrical Safety Regulations Act 2013
Drawing Package
zone boundaries, equipment ratings, installation notes
Authority Submission
documentation suitable for lodgement with electrical safety authorities
Diesel, Petrol, LPG
classification for common fuel types

Shipping & Dimensions

Ships from Brisbane warehouse. Standard delivery 2-5 business days.

Compatible Products

Frequently Asked Questions

Can't find your answer?

Contact Us
What is Hazardous Area Classification?

Engineering documentation that defines explosive atmosphere zones around fuel storage and dispensing, specifying what electrical equipment ratings are required in each zone. Mandatory under AS/NZS 3000 Section 7.7 for fuel installations.

Why is this mandatory?

AS/NZS 3000 wiring rules require classification for areas where flammable vapours may be present. Without it, electrical inspectors will not sign off the installation, and insurance may be void.

What does the package include?

Site-specific zone classification drawings, equipment suitability schedules, installation parameters, and engineer certification. Prepared to AS/NZS 60079.10.1/2 and suitable for lodgement with state electrical safety authorities.

How long does preparation take?

Typical turnaround is 2-3 weeks from receipt of site layout, fuel type, and storage volume details. Rush service available for urgent projects at additional cost.

What if my site layout changes after classification?

Material changes to tank location, fuel type, or storage volume may require re-classification. Contact sales@goind.com.au or 07 3204 2240 to discuss scope and re-issue cost.